Arayat Flood Control Failure Displaces 22 Families, Officials Coordinate Resettlement
Arayat Flood Control Failure Displaces 22 Families

Arayat Flood Control Structure Failure Forces 22 Families to Evacuate

Local authorities in Arayat, Pampanga are actively coordinating the resettlement of residents from Barangay Candating who were displaced following the sudden erosion of a critical flood control structure in the area. The incident has prompted immediate emergency response efforts from municipal and congressional officials.

Immediate Evacuation and Temporary Shelter Arrangements

Arayat Mayor Jeffrey Luriz confirmed that at least 22 families have been directly affected by the structural failure, forcing them to abandon their homes along the vulnerable riverbank. "At present, they are temporarily staying with relatives because it has become truly dangerous to remain in the area," Mayor Luriz stated, emphasizing the urgent safety concerns. The local government has mobilized resources to provide essential assistance to these displaced households during this transitional period.

Congressional Intervention and DHSUD Coordination

Former Pampanga Third District Representative Aurelio "Dong" Gonzales, who now serves as consultant to incumbent Congresswoman Mica Gonzales, announced he will advise the lawmaker to engage directly with the Department of Human Settlements and Urban Development (DHSUD) to facilitate permanent relocation solutions. "I will ask her to talk to the secretary of DHSUD to relocate the families affected along the riverbank," Gonzales declared. The congresswoman is scheduled to visit the displaced families this week to personally assess their conditions and extend additional support.

Multi-Agency Meeting and Investigation Launch

On Monday, Mayor Luriz and Consultant Gonzales convened with officials from the Department of Public Works and Highways (DPWH) Pampanga 1st District Engineering Office, alongside representatives from project contractor EddMari Construction and Trading. This coordination meeting focused specifically on addressing the compromised flood control project and planning next steps.

During the discussions, officials revealed that a formal investigation has been initiated to determine the precise cause of the erosion. The probe aims to identify whether construction flaws, material deficiencies, or environmental factors contributed to the structure's failure. Additionally, all parties committed to developing a comprehensive long-term solution to prevent similar incidents and ensure community safety.

The situation highlights ongoing challenges in infrastructure resilience and disaster response in flood-prone areas of Pampanga, with affected families awaiting permanent housing solutions while authorities work to address both immediate needs and systemic vulnerabilities.